24/7 Field Service · +1 866 864 3533 · [email protected]
Region: US CA MX Global EN | ES
Tracked asphalt paver laying hot-mix on a multi-lane highway at golden hour
Highway Corridors · Hot-Mix Asphalt

Asphalt Pavers Engineered for Mat Width You Can Hold

Tell us your lane width, lift thickness and daily tonnage — Vögele application engineers stage a tracked or wheeled paver with electric-heat screed that keeps nuclear-gauge density inside the specification window.

  • 2.55–13 mScreed width packages
  • 70+Countries with paving support
  • < 18hContracted MTTR target

Paving Procurement & Service FAQ

Straight answers equipment managers ask before locking a paver purchase order — lead time on the left, field support on the right.

Procurement & Logistics

Typical PO-to-site lead time for a mid-class tracked paver?
Standard tracked asphalt pavers ship in 12–16 weeks ex-works; electric-heat screed packages with dual feed conveyors run 14–18 weeks including foundation and trailer review.
FOB versus CIF for overseas paving fleets?
FOB at major export ports is standard; CIF/DAP consolidation is available when multiple pavers and material feeders move on one voyage.
Country compliance packs for Africa / LATAM / Middle East?
EPA Tier 4 Final, CE Machinery Directive 2006/42/EC, GOST-R and INMETRO documentation issued upon request with serial-matched emission logs.
Can you stage a demo on our night-closure corridor?
Yes — application engineers schedule on-site paving demos when mat width, mix design and roller train are confirmed two weeks ahead.

Service & Spare Parts

Field-service response on contracted paving sites?
Target < 18 h mean-time-to-repair on active service contracts, backed by regional hubs stocking screed plates, conveyor chains and auger flights.
Screed plate and conveyor rebuild intervals?
Inspect electric-heat elements and plate wear every 500 paving hours; full screed rebuilds typically land between 3,000–4,500 hours depending on abrasive mixes.
Do you stock Vogele paver parts for Super-class machines?
Yes — hopper flights, screed extensions, track shoes and hydraulic pumps for common Super-class platforms are held at Americas, EMEA and APAC hubs.
Operator familiarization included?
Commissioning week includes screed warm-up SOP, grade/slope sensor setup and hopper management coaching for your paving foreman.

Open the full buyer FAQ →

Asphalt paver screed laying binder course with material transfer vehicle ahead

Tracked Asphalt Paver — Corridor Spec

Built for crews who argue about mat temperature, not brochure slogans. Each point below maps to a setting your densitometer crew can verify on the first night closure.

  • ✓ Screed width packages 2.55 – 13.0 m
  • ✓ Hopper capacity up to 14 t with dual conveyors
  • ✓ Engine Tier 4 Final / Stage V, typically 129–191 kW class
  • ✓ Hydraulic cleanliness ISO 4406 18/16/13 from factory
  • ✓ Cab ROPS + FOPS with grade/slope automation ports
  • ✓ On-site commissioning + paving-foreman training

Asphalt Paver — Engineering Spec Groups

Expand the groups procurement and mechanical engineers request in bid packages. Values shown are representative class ranges; final charts ship with the serial-number pack.

Engine & Emissions
Power class129 – 191 kW depending on chassis
Tier 4 Final / Stage VDPF + SCR aftertreatment with serial NOx/PM log
DEF tankSized for full paving shift without mid-mat refill
Screed & Mat Geometry
Basic screed width2.55 m with hydraulic extensions
Maximum paving widthUp to 13.0 m with bolt-on extensions
Layer thicknessTypically 0 – 300 mm depending on mix and screed
Screed heatElectric heat with zone control
Material Feed & Hydraulics
Hopper capacityUp to ~14 t class on mid/large tracked units
Conveyors / augersDual feed with proportional hydraulic control
Hydraulic cleanlinessISO 4406 18/16/13 factory fill
Pilot pressureStable for grade/slope and screed lock circuits
Undercarriage / Chassis
Drive optionsTracked for soft subgrade · wheeled for urban transfers
Operating weightClass-dependent; confirmed on order configuration
Ground pressureTrack shoe width selected for soft base courses

What Paving Supervisors Report After Commissioning

Anonymous notes from highway and municipal crews — focused on uptime, mat quality and parts response, not marketing adjectives.

"Commissioned the tracked paver on a 9 km binder overlay in four nights — screed warm-up curve matched the SOP and we hit density on the second pass."
Paving SuperintendentHighway contractor, US Midwest
"Electric-heat screed zones held mat temperature across a 7.5 m widening. Field service swapped a conveyor chain overnight so the night closure stayed open."
Equipment ManagerMunicipal paving fleet, Northern Europe
"We debated wheeled versus tracked for urban overlays — the advisor staged a wheeled unit with compact screed and our curb returns stopped tearing."
Site SupervisorUrban road authority subcontractor, SE Asia

Send Specs to Our Paving Field Team

Include company, site country, equipment class and whether Tier 4 Final paperwork is mandatory. Attach a lift plan or densitometer log if you have one — even a phone photo helps stage the right screed package.

  • Mat width and daily tonnage drive chassis class
  • Application engineer replies within one business day
  • No obligation corridor assessment for qualified projects

Ready to Quote Your Next Paving Train?

Regional parts hubs · < 18 h MTTR on contracted sites · CE / EPA Tier 4 Final documentation packs on call.